Sazlıdere Bridge

    The Sazlıdere Bridge is a landmark cable-stayed bridge currently under construction as part of the Başakşehir–Nakkaş Motorway, designed to carry the route across the planned Kanal İstanbul corridor.

    Within this prestigious project, HANDAR is responsible for the design, fabrication, and on-site installation of the deck erection gantry system used for bridge deck construction. Engineered to meet the project's technical requirements, the system enables the safe, accurate, and efficient installation of deck segments while maintaining high standards of quality and construction safety.

    Through its expertise in heavy lifting systems and bridge engineering, HANDAR delivers integrated solutions that combine innovative design, precision manufacturing, and reliable on-site execution, reinforcing its commitment to Engineering Excellence.

    Location: Istanbul - Turkiye
    Client: Ballast Nedam
    Project Scope:
    Erection and installation of 440 mt Bridge Evacuation System
    Total Length: 1.618 Meter
    Main Span: 440 Meter
    Tower Height: 196 Meter
    Deck Width: 46 Meter
    Start-Finish Date:
    November 2025 – January 2027