Umm Bab Cement Plant Line 5

Umm Bab Cement Plant, established in Qatar, includes the 5th unit with a capacity of 5000 tpd, which was built in addition to the existing 4 units.

Within the scope of the project, complete mechanical and steel site fabrication, mechanical assembly works carried out by Handar. Starting from the crusher building, raw mill, preheater tower, cooling unit, silos, all material handling system and loading unit, field manufacturing of cast refractory and brick refractory works were successfully completed out by HANDAR.

Location: Umm Babb - Qatar
Client: QNCC - FIVES FCB
Project Scope:
Complete Mechanical Erection Works
Technical Data: 5000 TPD
Start-Finish Date:
10.03.2015 - 01.05.2016 -